Dirty Utility Room Plumbing Installation at Barnet Hospital

Barnet

Healthcare | Hospital

Scope:

PSB Mechanical Services was commissioned to convert an existing space into a dirty utility (sluice) room within a ward at Barnet Hospital. The project required precise planning to integrate new plumbing services within an operational hospital environment.

Work carried out:

The team located existing hot, cold, and waste services within the ward to enable a clean and effective supply to the new sluice sink. Pipework was altered to suit the new layout, allowing the installation of a compliant sluice sink within the newly designated Dirty Utility Room.