Gas Tap and Interlock System Installation at Heatherton School, Chesham

Chesham

Education | School

Scope:

Heatherton School required the installation of gas taps within a science classroom to facilitate the safe use of Bunsen burners by students. A compliant and robust gas supply system was essential for the project.

Work carried out:

PSB Mechanical Services installed a new gas supply and integrated gas interlock system for classroom safety. Custom-made frameworks were fabricated to mount the lab gas taps centrally within the classroom tables. The installation ensures both functionality and safety, enhancing the science learning environment for students.